+8615045064735
WhatsAppTelegramTG BotLinkedInXVKv999666999666+84388858315+79140919696

AI Data Centers & Mining Farm Conversion

We build and convert data centers for artificial intelligence — from site and power sourcing to a finished facility with installed equipment. One partner, one contract, full accountability.

Who We Are Looking For

Mining farm owners who want to sell

We are looking for finished and partially finished mining farms and data centers. We assess equipment, infrastructure, power connection and location. We buy the whole site or individual blocks.

Farm owners who want to convert to AI

We rebuild existing mining sites for AI workloads: cooling, power, racks, network and compute hardware. We keep whatever can be reused and bring the facility up to the requirements of modern GPU clusters.

Those who want to build an AI data center from scratch

Greenfield projects from 5 MW and up. We take on land and power sourcing, permits, design, construction, commissioning and equipment supply.

Investors

We accept investment into the construction and development of AI data centers. We work on a build-to-suit model, joint venture (JV) co-investment, or a "find and de-risk" mandate.

What We Do

We sell AI hardware

GPUs, servers, liquid cooling systems, power, network and modular solutions. More than 30 suppliers in a single order. New, used and refurbished equipment.

We build turnkey AI data centers

To your specification or to our design. From a small site to 50–100+ MW facilities.

We consult and run analysis

Assessment of your current farm or land plot, economics modelling, power and permit verification, comparison of retrofit versus new build. Provided as a paid engagement.

How We Work

  1. Assessment and analysis

    We review your facility, power, budget and goals.

  2. Site and power

    We find or verify land and electricity supply.

  3. Permits

    We take on zoning, environmental and construction approvals.

  4. Design

    Electrical, cooling and structure engineered for the required GPU density.

  5. Construction and fit-out

    A single schedule covering both the building and the equipment.

  6. Commissioning

    Testing, launch and, if required, ongoing operation.

Typical time to first power on a greenfield project is about 9 months after power and permits are secured. Retrofitting an existing farm is usually faster.

Cooperation Formats

Build-to-suit

We build the facility to your requirements and you become the owner.

Co-investment / JV

We share the risk and the return.

Acquisition and development

We source land plots or distressed assets, de-risk them and develop them for you.

Equipment supply

Standalone or as part of a full project.

Consulting

One-off engagement or support across every stage.

Why Work With Us

  • One accountable contract — from land and power to working equipment.
  • We run siting, grid connection and permitting in parallel to reach power faster.
  • We design for AI workloads from day one: high rack density, precision cooling and compatible hardware.
  • We reduce capital risk: feasibility, power and permits are confirmed before the main investment.

Start the Conversation

Write to us if you:

  • are selling a mining farm or data center,
  • want to convert a farm for AI,
  • are planning to build from scratch,
  • are looking for where to invest in AI infrastructure,
  • need equipment or consulting.